On This Water

Stay or drive

Two desks, one day

Monday, September 7. Same method. Same 1–10. Pick the water, not the drive you already decided.

Left desk

puerto-rico · Parguera

La Parguera / southwest

7.5OF 10

Day

medium

Snook should be the day — the village run is legal; the trees want current.

6 mph E · 6% rain · high slack

Where

  • Magueyes Island · 6.8structure piling on a high slack tide is a workable match.
  • Parguera mangrove cays · 6.4mangrove edge on a high slack tide is a secondary match.
Open the Parguera brief

Right desk

texas · Sabine

Sabine Lake

7.5OF 10

Day

medium

Redfish should be the day — wait — slack on a border estuary is a pause, not a hunt.

14 mph S · 28% rain · high slack

No live gauge this hour — the printed tide is the forecast.

Where

  • Texas Point / Sabine Pass · 6.9pass jetty on a high slack tide is a secondary match.
  • Keith Lake Cut · 6.8marsh drain on a high slack tide is a secondary match.
  • Sabine Bank · 6.3pass jetty on a high slack tide is a secondary match.
Open the Sabine brief